A permit is required prior to erecting a sidewalk shed or supported scaffold over 40 feet in height. If a scaffold is on top of a sidewalk shed, the height of the scaffold must include the height of the shed and be taken from the top of the sidewalk. If the supported scaffold is located on a setback or roof of a building, and if the outer leg of the scaffold is located a distance less than half the height of the scaffold (from the top of roof or floor slab), the height of the scaffold for permitting purposes shall include the height of the building below.
Prior to erecting a sidewalk shed, an owner must obtain a permit from DOB. The applicant for a sidewalk shed permit must state the reason such sidewalk shed is needed. These permits are good for one year. Sidewalk sheds must be dismantled within thirty days of permit expiration. Should a renewal of the shed permit be required, other than a new building under construction, an architect or engineer must conduct a thorough examination and report to the commissioner on the work that has been performed and an estimate of the time needed to complete the work. Additionally, in New York City, Local Law No. 33 also mandated that the permit holder post a twenty-five square foot sign on the sidewalk shed with the permit holder’s name, address, telephone number and permit number and expiration date. Adequate lighting must be maintained under the shed. The Construction Division within each borough office of the Department of Buildings (DOB) has jurisdiction over sidewalk sheds.
(914)512-7619